Queens Long Island City-Hunters Point
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
18 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |
| Mar 8, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.WAREHOUSE TYPE STRUCT W/WOOD BOWSTRING TRUSS ROOFF.JOB#440199170 TO RPR THE TRUSS WAS DISAPPROVED ON 3/5/15.NO SUBSEQUENT APP HAVE BEEN FILED W/DOB.FAIL TO OBTAIN DEPT APPROVAL&OBTAIN PERM IN TIMELY FASHION WILL BE A BREACH.REMEDY:RPR DWGS PREP BY LIC PE TO BE FILED W/DOB NO LATER 4/9/18.WRK UND PERM BEG NO LATER 4/16/18 |
| Jun 23, 2017 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION |
| Jun 23, 2017 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION |
| Dec 16, 2016 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION |
| Dec 16, 2016 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION |
| Mar 3, 2015 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION |
| Mar 3, 2015 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION |
| Sep 12, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAIURE TO COMPLY WITH A COMMISSIONER'S ORDER. THE BUILDING IS A WARE- HOUSE-TYPE STRUCTURE WITH A WOOD BOWSTRING TRUSS/ROOF. THE DEPARTMENT SERVED YOU WITH A CURABLE COMMISSIONER'S ORDER (NOTICE OF VIOLATION) TO PRODUCE AN ENGINEER'S REPORT ON YOUR BUILDING. NO ENGINEER'S REPORT HAS BEEN RECEIVED |
| Jun 26, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | NYC ADMIN CODE- ADD'L OCCUP 1 STORY BLDG WITH WOOD BOWSTRING ROOF REMEDY:W/I 60 DAYS OF INSPECTION OWNER TO ENGAGE A NYS LICENSED PE EX W/ WOOD TRUSS TO PROBE AND EVALUATE STRUCTURAL SOUNDNESS USING FIELD VERIF,CALCS,PROBES,ECT. EACH TRUSS AND BEARING TO BE EVAL. ANY DEF TO BE SHORED. REPAIR DRWINGS TO BE FILED WITH DOB WITHIN 45 DAYS AFTER IN |
| Dec 18, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |