NYC Building Report

Queens Elmhurst

40-13 80 Street, Queens

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 4-01491-0055), so they can include other buildings on the same lot.

6 records

Date Class Status Apartment Summary
Mar 30, 2004 B VIOLATION CLOSED ATTIC § 9, 56, 193, 300, 302 M.D. LAW- ABOVE FRAME BUILDING HAS BEEN CONVERTED FROM A PRIVATE DWELLING TO A MULTIPLE DWELLING AND IS NOW OCCUPIED AND MAINTAINED AS SUCH CONTRARY TO LAW.RESTORE PREMISES TO LAWFUL OCCUPANCY LOCATED AT APT ATTIC, 3rd STORY
Sep 21, 2003 B VIOLATION CLOSED 1 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1, 1st STORY
Aug 28, 2003 B VIOLATION CLOSED # 1 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT # 1, 1st STORY
Aug 28, 2003 C VIOLATION CLOSED # 1 § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT KITCHEN & BATHROOM IN THE ENTIRE APARTMENT LOCATED AT APT # 1, 1st STORY
Aug 28, 2003 C VIOLATION CLOSED # 1 § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT # 1, 1st STORY
Aug 4, 2003 B VIOLATION CLOSED Not available § 27-2087 ADM CODE - DISCONTINUE USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS SHOWER,WATERCLOSET AND WASHBASIN , CELLAR