Queens Flushing-Willets Point
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 13, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-ON 3/17/2022 A 5 ALARM FIRE OCCUREDAS A RESULT 40-12 BLDG WAS CHARRED OWNER TO RETAIN CONTRACTOR TO INSTALL TIGHTBEARD FENCE AT EXP1, MAIN ST SIDEWALK AS REQ'D TO SECURE SITE. FILE JOB |
| Jun 10, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-ON 3/17/2022 A 5 ALARM FIRED OCCUREDAT 40-10 MAIN ST. AS A RESULT 40-12 BLDG WAS DAMAGED OWNER TO RETAIN NYSPE AND CONSTRACTOR TO: REMOVE DEBRIS AND PARTIALLY DEMOLISH COLLAPSED REAR ROOF |
| Mar 18, 2022 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL ACCESSIBLE OPENINGS TO SECURE AGAINST UNAUTHORIZED ACCESS.AND TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Mar 17, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN-ON 3/17/22 5 ALRM FIRE @40-10.DMG TO 40-12 APPRX 25'W X 10'D SECTN-REAR ROOF ALONG EXP3 COLPSD INTO 1FL,WATER DMGDEBRIS THRUOUT 1FL,EXP1 DOOR OPEN/EXPSD.CELLAR FLOODED.DMG DUE TO FIRE OWNR RETAIN NYSPE-EVAL ENTRE BLDG&PREP/FILE RPR DWGS.RPR BLG UNDR PRMT START BY 4/25/2022,COMPLT /SIGNOFF BY 5/27/2022 |
| Mar 17, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT OF INSPECTION OBSERVED SEVERE WATER, SMOKE DAMAGE THROUGHOUT ALONG WITH ROOF PARTIALLY COLLAPSED AT REAR REMAINING SECTIONS IN DANGER OF FURTHER COLLAPSE. |
| Nov 19, 2001 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |