Queens Elmhurst
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
87 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 5, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D.OBSVD @ EXP2/3 CRACKED/BULGING STUCCO IN THE SHARED COURTYARD @ EXP1 OBSVD BULGING MASONRY @ 2FL ABOVE THE LINTEL & SOME DETERIORATED MORTAR JOINTS.IMMED COMPLY W/COMMISSIONER'S ORDER 348209 & 050125PI404-5SB TO PROVIDE A CORRECTIVE ACTION PLAN REPR BLDG UNDER PERMIT |
| Jun 27, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#348210 VIO#050125PI40406SB DATED 05/01/25 REQUIRING THE OWNER TO SUBMIT A CORRECTIVE ACTION PLAN W/IN 30 DAYS FROM DATE OF P.I INSP AS OF TODAY 06/27/25 A CORRECTIVE ACTION PLAN WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348210 VIO#050125PI40406SB TO SUBMIT CORRECTIVE ACTION PLAN |
| Jun 27, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#348208 VIO#050125PI40404SB DATED 05/01/25 REQUIRING OWNER TO SUBMIT A CORRECTIVE AC TION PLAN W/IN 30 DAYS FROM DATED OF P.I INSP AS OF TODAY 06/27/25 A CORRECTIVE ACTION PLAN WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348208 VIO#050125PI40404SB TO SUBMIT CORRECTIVE ACTION PLAN |
| Jun 27, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#348207 VIO#050125PI40403SB DATED 05/01/25 REQUIRING OWNER TO SUBMIT A CORRECTIVE ACTION PLAN W/IN 30 DAYS FROM DATE OF P.I INSP. AS OF TODAY 06/27/25 A CORRECTIVE ACTION PLAN WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348207 VIO#050125PI40403SB TO SUBMIT CORRECTIVE ACTION PLAN |
| May 2, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: ERECT CONSTRUCTION FENCE |
| May 2, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: ERECT CONSTRUCTION FENCE |
| May 1, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D. OBSVD @ EXP2/3 CRACKED/BULGING STUCCO @ SHARED COURTYARD. OWNER TO INNED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG & TO SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV W/IN 30 DAYS ADDRESSING ALL CONDITIONS W/PLANS,PHOTOS RECOMMENDING TIME FRAME AND REPAIRS TO BE COMPLETED |
| May 1, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTION ACTION PLAN REQ'D OBSVD @ EXP2/3 CRACKED/BULGING STUCCO IN THE SHARED COURTYARD.@ EXP1 OBSVD BULGING MASONRY @ 2FL ABOVE LINTEL & SOME DETERIORATED MORTAR JOINTS. OWNER TO IMMED RETAIN A REG DESIGN PROF TO EVAL ENTIRE BLDG & SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV W/IN 30 DAYS ADRESSING ALL CONDITIONS |
| May 1, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTION ACTION PLAN REQ'D. OBSVD @ EXP3 SHARED COURTYARD CRACKED/ BULGING STUCCO. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG&SUBMIT CORRECTION ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV W/IN 30 DAYS ADDRESSING ALL COND W/PLANS,PHOTOS RECOMMENDING TIME FRAME & REPAIRS T/BE COMPL.BLDG T/BE REPAIRED UNDER PERMIT |
| May 1, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTION ACTION PLAN REQ'D. OBSVD @ EXP1 BULGING BRICKS @ THE CORNER OF THE LINTELS ON 2FL. @ EXP2/3 OBSVD CRACKED/BULGING STUCCO IN THE SHARED COURTYARD. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG & TO SUBMIT CORRECTIVE ACTION PLAN W/IN 30 DAYS ADDRESSING ALL COND WITH PLAN,PHOTOS,RECOMMENDING TIME FRAME & REPAIRS T/BE COMPL |
| Oct 16, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Jan 6, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS@BUILDINGS.NYC.GOV W/IN 30 DAYS, ADDRESSING ALL CONDITIONS W/PLANS, PHOTOS, RECOMMENDING TIME FRAME AND REPAIRS TO BE COMPLETED. TEL #718-278-3460 |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jun 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Sep 5, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 14, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK ORDER.BLDG IS 3ST+CELL,WOOD JOISTS/STEEL FRAMING OVER SOLID MASONRY WALLS.MID BEAR WALLS REMOVED AT 2NDFL LEAV 3RDFL FRAMIN IMPROP SUPPORT&BEAR WALL AT 3RDFL DISCONTINOUS W/O CLEARLOAD PATH.REMEDY:OWN IMMED ENGAGE PROF ENG&CONT'R EVAL BLDG&PROV SHOR/REINSTATE STRL INTEG OF BEAR WALL.SHOR WRK FILED W/2BUS DAYS.STOP WRK ONCE SHOR IS COMPLETE |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Feb 8, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Feb 26, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 15, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Feb 1, 2010 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL |
| Jan 1, 2009 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Oct 3, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |