Queens
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
11 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 10, 2023 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE |
| Jan 10, 2023 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE |
| Sep 26, 2022 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | FULLY DEMOLISH BUILDING.COORDINATE WITH FDNY BATTALION47 @ BAT04@FDNY NYC.GOV & 718-476-6247 DUE TO INCOMPLETE SEARCHES.COORDINATE WITH ED FOR DEMO AT 1 BEACH 85 STREET BUILDING ON SAME LOT |
| Sep 26, 2022 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | FULL DEMOLISH BUILDING COORDINATE WITH FDNY BATTALION47 @ BAT047@FDNY NYC.GOV & 718-476-6247 DUE TO INCOMPLETE SEARCHES. COORDINATE WITH ED FOR DEMO AT 1 BEACH 85 STREET BUILDING ON SAME LOT |
| Sep 26, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT APPROXIMATELY 15LINEAR FEET OF 8FT HIGH WOOD FENCE FROM BUILDING CORNER TO CHAIN LINKED FENCE ACROSS THE ENTRY WAY TO PREVENT UNAUTHORISED ACCESS |
| Sep 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-BLDG SUPPRTD ON TIMBER PILES W/IN HIGH WATER ZONE.TIMBER PILES DTRIORTD THRUOUT W/EXTRMLY DTRIORTD PILES @EXP4.OBSVD ADDTIONAL TIMBER PILES &WOOD FRMNG UNDR 1FL FRMNG INSTLLD W/O PRMTS @EXP4 NYSPE STRCTRL ENGNR-IMMED EVAL ENTIRE BLDG &DSGN RPRS.FILE PRMTS BY 12/23/22.STRT WRK BY 1/14/23.CMPLT RPRS BY 4/14/23 |
| Sep 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO MAINTAIN-BLDG IS SUPPRTD ON TIMBER PILES THAT ARE DTERIORATD TIMBER PILES EXTREMELY DTRIORATED @EXP4 SIDE OF BLDG.ROOFNG EXTREMLY DTRIORTD &ROOF APPEARS TO BE NO LONGER WATER TIGHT NYSPE STRCTRL ENGNR-IMMED EVAL ENTIRE BLDG &DSGN RPRS.FILE PRMTS BY 12/23/22.STRT WRK BY 1/14/23.CMPLT RPRS BY 4/14/23 |
| Sep 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PREMISES RENDERED NON-COMPLIANT DUE TO FIRE. NOTED: FIRE OCCURED WITH EXTERNAL DAMAGE THROUGH-OUT, HAVING CHARRED BEAMS, PARTITIONS, SMOKE + WALLS |
| Sep 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PREMISES RENDERED NON-COMPLIANT DUE TO FIRE. NOTED: FIRE OCCURED AT SAID ADDRESS WITH FIRE DAMAGE THROUGH-OUT, MISSING ROOF, FREE STANDING PARTITIONS |
| Sep 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED EGRESS/INGRESS FOR THIS BUILDING COMPROMISED DU TO FIRE AT ADJACENT BUILDING. VACATE ENTIRE BUILDING. |
| Sep 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED BUILDING FOUNDATION PILES IN DISREPAIR CONDITIONS AND IN DANGER TO FUTURE COLLAPSE. VACATE ENTIRE BUILDING |