NYC Building Report

Queens

4 Bch 85 St, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

11 records

Date Status Type Summary
Jan 10, 2023 V-DOB VIOLATION - ACTIVE COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE
Jan 10, 2023 V-DOB VIOLATION - ACTIVE COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE
Sep 26, 2022 V-DOB VIOLATION - ACTIVE EGNCY-EMERGENCY NONE FULLY DEMOLISH BUILDING.COORDINATE WITH FDNY BATTALION47 @ BAT04@FDNY NYC.GOV & 718-476-6247 DUE TO INCOMPLETE SEARCHES.COORDINATE WITH ED FOR DEMO AT 1 BEACH 85 STREET BUILDING ON SAME LOT
Sep 26, 2022 V-DOB VIOLATION - ACTIVE EGNCY-EMERGENCY NONE FULL DEMOLISH BUILDING COORDINATE WITH FDNY BATTALION47 @ BAT047@FDNY NYC.GOV & 718-476-6247 DUE TO INCOMPLETE SEARCHES. COORDINATE WITH ED FOR DEMO AT 1 BEACH 85 STREET BUILDING ON SAME LOT
Sep 26, 2022 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT APPROXIMATELY 15LINEAR FEET OF 8FT HIGH WOOD FENCE FROM BUILDING CORNER TO CHAIN LINKED FENCE ACROSS THE ENTRY WAY TO PREVENT UNAUTHORISED ACCESS
Sep 23, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM-BLDG SUPPRTD ON TIMBER PILES W/IN HIGH WATER ZONE.TIMBER PILES DTRIORTD THRUOUT W/EXTRMLY DTRIORTD PILES @EXP4.OBSVD ADDTIONAL TIMBER PILES &WOOD FRMNG UNDR 1FL FRMNG INSTLLD W/O PRMTS @EXP4 NYSPE STRCTRL ENGNR-IMMED EVAL ENTIRE BLDG &DSGN RPRS.FILE PRMTS BY 12/23/22.STRT WRK BY 1/14/23.CMPLT RPRS BY 4/14/23
Sep 23, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAIL TO MAINTAIN-BLDG IS SUPPRTD ON TIMBER PILES THAT ARE DTERIORATD TIMBER PILES EXTREMELY DTRIORATED @EXP4 SIDE OF BLDG.ROOFNG EXTREMLY DTRIORTD &ROOF APPEARS TO BE NO LONGER WATER TIGHT NYSPE STRCTRL ENGNR-IMMED EVAL ENTIRE BLDG &DSGN RPRS.FILE PRMTS BY 12/23/22.STRT WRK BY 1/14/23.CMPLT RPRS BY 4/14/23
Sep 23, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PREMISES RENDERED NON-COMPLIANT DUE TO FIRE. NOTED: FIRE OCCURED WITH EXTERNAL DAMAGE THROUGH-OUT, HAVING CHARRED BEAMS, PARTITIONS, SMOKE + WALLS
Sep 23, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PREMISES RENDERED NON-COMPLIANT DUE TO FIRE. NOTED: FIRE OCCURED AT SAID ADDRESS WITH FIRE DAMAGE THROUGH-OUT, MISSING ROOF, FREE STANDING PARTITIONS
Sep 23, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL AT TIME OF INSPECTION OBSERVED EGRESS/INGRESS FOR THIS BUILDING COMPROMISED DU TO FIRE AT ADJACENT BUILDING. VACATE ENTIRE BUILDING.
Sep 23, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL AT TIME OF INSPECTION OBSERVED BUILDING FOUNDATION PILES IN DISREPAIR CONDITIONS AND IN DANGER TO FUTURE COLLAPSE. VACATE ENTIRE BUILDING