NYC Building Report

Queens Sunnyside

39-20 Greenpoint Ave, Queens

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 4-00207-0001), so they can include other buildings on the same lot.

398 records

Date Class Status Apartment Summary
May 14, 2021 C VIOLATION DISMISSED 3L § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST
May 14, 2021 B VIOLATION DISMISSED 7M § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 7M, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WEST
May 14, 2021 B VIOLATION DISMISSED 7M § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 7M, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WEST
May 14, 2021 B VIOLATION DISMISSED 7M § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK INSTALLED ON ENTRANCE DOOR TO ROOM WITH FIRE ESCAPE WINDOW IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 7M, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WEST
May 14, 2021 C VIOLATION DISMISSED 7M § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 1; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 7M, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT WEST
May 14, 2021 B VIOLATION DISMISSED 2O § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2O, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST
May 14, 2021 B VIOLATION DISMISSED 2O § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2O, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST
Apr 12, 2021 C VIOLATION CLOSED 7M § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 7M, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
Apr 12, 2021 C VIOLATION CLOSED 5J § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 4th STORY, 5th APARTMENT FROM EAST AT SOUTH
Apr 12, 2021 C VIOLATION CLOSED 4F § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
Apr 12, 2021 C VIOLATION CLOSED 4A § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH
Apr 12, 2021 C VIOLATION CLOSED 3L § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 3L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Apr 12, 2021 C VIOLATION CLOSED 3K § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT No access to the apartment. IN THE ENTIRE APARTMENT LOCATED AT APT 3K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apr 12, 2021 C VIOLATION CLOSED 3H § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 3H, 2nd STORY, 4th APARTMENT FROM EAST AT SOUTH
Apr 12, 2021 C VIOLATION CLOSED 2L § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 2L, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Apr 12, 2021 C VIOLATION CLOSED 2E § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Apr 12, 2021 C VIOLATION CLOSED 6U § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 6U, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apr 12, 2021 C VIOLATION CLOSED 5W § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 5W, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apr 12, 2021 C VIOLATION CLOSED 5V § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 5V, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Apr 12, 2021 C VIOLATION CLOSED 4N § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Apr 12, 2021 C VIOLATION CLOSED 4W § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 4W, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apr 12, 2021 C VIOLATION CLOSED 4V § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 4V, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apr 12, 2021 C VIOLATION CLOSED 4R § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Apr 12, 2021 C VIOLATION CLOSED 3V § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 3V, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apr 12, 2021 C VIOLATION CLOSED 3U § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 3U, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Apr 12, 2021 C VIOLATION CLOSED 2T § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 2T, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Apr 12, 2021 C VIOLATION CLOSED 2S § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 2S, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
Apr 12, 2021 C VIOLATION CLOSED 2O § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT APT 2O, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Apr 12, 2021 C VIOLATION CLOSED 1V § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT 1V, 1st BSMT-APT FROM SOUTH AT WEST
Apr 12, 2021 C VIOLATION CLOSED 1P § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT 1P, 1st BSMT-APT FROM NORTH AT EAST
Apr 12, 2021 C VIOLATION CLOSED 1O § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT , IN THE ENTIRE APARTMENT LOCATED AT BSMT-APT 1O, 1st BSMT-APT FROM WEST AT NORTH
Jan 13, 2021 A VIOLATION CLOSED 7B § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE 2nd ROOM FROM NORTH AT WEST, THE KITCHEN , THE FOYER LOCATED AT APT 7B, 6th STORY, 4th APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Jan 13, 2021 B VIOLATION CLOSED 7B § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 7B, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
Jan 13, 2021 B VIOLATION CLOSED 7B § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING LOCATED AT APT 7B, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
Jan 13, 2021 A VIOLATION CLOSED 7B § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 7B, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
Jan 13, 2021 C VIOLATION CLOSED 7B HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 7B, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
Jan 13, 2021 B VIOLATION CLOSED 7B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 7B, 6th STORY, 4th APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Dec 29, 2020 C VIOLATION CLOSED 6J § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ..... IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 5th STORY, 5th APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
Dec 29, 2020 C VIOLATION CLOSED 6B § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ..... IN THE ENTIRE APARTMENT LOCATED AT APT 6B, 5th STORY, 4th APARTMENT FROM WEST AT NORTH , SECTION AT WEST
Dec 29, 2020 C VIOLATION CLOSED 7N § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 7N, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH
Dec 29, 2020 C VIOLATION CLOSED 7F § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT .... IN THE ENTIRE APARTMENT LOCATED AT APT 7F, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Dec 29, 2020 C VIOLATION CLOSED 7B § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 7B, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
Oct 24, 2020 C NOV SENT OUT Not available § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.
Jan 15, 2020 C NOV SENT OUT Not available § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.
Oct 25, 2018 B CERTIFICATION POSTPONMENT GRANTED 5B § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 5th APARTMENT FROM WEST AT NORTH
Feb 27, 2018 B NOV CERTIFIED LATE 5B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5B, 4th STORY, 4th APARTMENT FROM WEST AT NORTH
Feb 27, 2018 B NOV CERTIFIED LATE 5B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5B, 4th STORY, 4th APARTMENT FROM WEST AT NORTH
Sep 22, 2017 A CERTIFICATION POSTPONMENT DENIED Not available § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
Sep 22, 2017 A CERTIFICATION POSTPONMENT DENIED Not available § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
Sep 22, 2017 A CERTIFICATION POSTPONMENT DENIED 5B § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 4th APARTMENT FROM WEST AT NORTH