Queens North Corona
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Mar 25, 2009 | V*-DOB VIOLATION - DISMISSED | Z-ZONING NONE | Z-ZONING NONE |
| Jan 8, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS CONTRACTORS H AS EXCAVATED APPROX 10 FEET DEEP X 35 FEET ALONG EXPOSURE 4 (AND EXP2) TO INSTALL LAGGING FOR SHORING OF EXCAVATION WITHOUT INSTALLING WALER S & RAKERS TO SUPPORT VERTICAL PILES IN THE PROCEDURE SPECIFIED IN SOE DOCUMENTS REMEDY: STOP ALL WORK IMMEDIATELY BACKFILL EXCAVATION |
| Jul 22, 2001 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |