| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 14, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVES 3 CONSTRUCTION WORKERS WORKING AT FIRST FLOOR AND CELLAR. REMOVED THE ELECTRIC WIRING HANGING LOOSE, INSTALLED NEW PLUMBING PIPES AT CELLAR AND PLUMBING WORK AT SECOND FLOOR BATH. EXCAVATION WAS DONE AT CELLULAR LEVEL. NO PERMIT FOR THIS WORK AT TIME OF INSPECTION. |
| Dec 14, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED AT CELLULAR LEVEL EXCAVATION WAS DONE REGARDING CELLAR SLAB REMOVAL TO ACCOMMODATE THE PLUMBING WORK. PROFESSIONAL ENGINEER REPORT REQUIRED REGARDING THE CELLAR. |