Queens Astoria (East)-Woodside (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 9, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#348412 VIO#121825PI40101SB DATED 12/18/2025 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 12/29/2025 AS OF 01/09/2026 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348412 VIO#121925PI40101SB |
| Dec 18, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D(7 DAY CAP)OBSVD @ EXP1 BULGING/CRACKED BRICK MASONRY @ PARAPET. @ EXP2 OBSVD SEVERAL HAIR LINE BRICK MASONRY CRACKS @ MULT LOCATIONS. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 12/29/25 ADDRESSING ALL DONDITIONS W/PLANS/PHOTOS |
| Dec 18, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD BRICK MSONRY BULGING/CRACKED NEAR PARAPET OF EXP1. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING 2024. SUBMIT ANNUAL PARPAET OBSERVATION REPORT FOR 2024-2026 O BE REC'D BY DOB NO LATER THAN JANUARY 1 2026 |