Queens Flushing-Willets Point
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 27, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 21, 2011 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 10, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | INADEQUATE PLANS FOR UNDERPINNING SHEETING SHORING BRACING NOTED: WORK ONGOING UNDER NB PERMIT# 402604151 NO LAYOUT OR CONSTRUCTION DETAILS FOR UNDERPINNING APPROACH/BOX PITS SOLDIER PILE LAYOUT IS 8 FEET 6 INC H APART FOR SHORING OF EXCAVATION PLANS DO NOT SHOW CONCRETE RETAINING WALL REMEDY: STOP ALL WORK BACKFILL AT UNDERPINNING SUBMIT ALL CONSTU |
| Feb 10, 2005 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT FIRST AND SECOND FLOORS LEVELS OBSERVED NO CARBON MONOXIDE DETECTOR S AS REQUIRED BY LOCAL LAW 7/04 |