Queens Flushing-Willets Point
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.FEU OBSERVED EXP2 WALL HAD PARTIALLY COLLPSED THE REMAING WALL AND ROOF JOISTS ARE UNSTABLE, AND LOOSE.OWNR TO IMMED RTAIN NYS PE&DOB REG CNTRCTR TO 1.PROPRLY SEAL/PRTCT ALL OPENINGS IN WALL,2.RMVE DEBRIS@INTERIOR,3.SHORE |
| Jun 28, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM.FEU OBSERVED ILLEGAL EXTERIOR ON THE REAR YARD.THE EXTENSION APPEATED TO BE NON-ENGINEERED AND UNPERMITTED.THE EXP2 WALL HAD PARTIALLY COLLPSED LEAVNG A FEW ROOF JOISTS INADEQUATELY SUPPORTD.OWNR TO IMMED RTAIN NYS PE TO EVAL ENT BLDG,DETERMINE STRCTRL STBILITY&FILE RPAIR DRWNGS.BLDG TO BE RPAIR UNDR PRMT |
| Jun 17, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FULL VACATE ORDER ISSUED FOR DAMAGES TO THE EXPOSURE 2 BEARING WALL AT THE REAR OF THE BUILDING 2ND FLOOR DUE TO THE BUILDING STRUCK BY A CAR WHICH CAME THROUGH THE WALLS OF THE ADJACENT PARKING GARAGE 33-70 PRINCE STREET. THE WOODEN WALL BROKEN, OPEN 6'X 10'. WINDOWS MISSING AND OR BROKEN. AC UNIT DAMAGED. |