Queens Astoria (Central)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 17, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER#347878(091825PI40103TC DATED 09/18/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 10/18/25&START BLDG REPAIRS UNDER PERMIT BY 11/17/25&COMPLETED/SIGNED OFF BY 12/17/25 AS OF 11/17/25 A REVISE CAP WAS NOT SUBMITTED FOLLWOING DOB REJECTION COMPLY W/COMMISSIONER'S ORDER#347878(091825PI40103TC)TO PROV A CAP |
| Sep 19, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: INSTALL SIDEWALK SHED |
| Sep 18, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD MISSING MORTAR AND CRACKS IN PARAPET AT EXP1 AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D SUBMIT ANNUAL PARAPET OBSERVATION REPORT TO BE REC'D BY DOB NO LATER THAN 10/2/25 |
| Sep 18, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-OBSVD STEP CRACK @ PARAPET LEVEL OF EXP1 NEAR 1/4 CORNER. OBSVS VERT CRACK IN CENTER OF PARAPET. OWNER TO IMMED RETAIN RDP TO EVAL ENTIRE BLDG AND SUBMIT CORRECTIVE ACTION PLAN BY ADDRESSING ALL CONDITIONS. BLDG TO REPAIRED UNDER PERMIT STARTING 11/17/25 AND COMPLETED/SIGNED OFF BY 12/17/25 |
| May 20, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 13, 2004 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |