Queens Astoria (Central)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 26, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-OBSVD AT EXP1 EXTERIOR FACADE WITH LOALIZED OUTWARD BULGING/DISPLACEMENT BELOW 2FL WINDOW ACCOMPIED BY HORIZONTAL CRACKING ALSO THE WOOD @ STORE FRONT SIGNAGE APPEARS DISPLACED. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/ DOB TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN |
| Feb 25, 2015 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 31, 2005 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 28, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |