Queens Far Rockaway-Bayswater
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 4-15629-0077), so they can include other buildings on the same lot.
20 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Jan 28, 2004 | B | VIOLATION CLOSED | Not available | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE EXTERIOR FACING BOARD AT FRONT AND SOUTH SIDE OF THE BUILDING 2STY AT YARD |
| Jan 28, 2004 | B | VIOLATION CLOSED | Not available | § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING RAIN LEADER AT THE SOUTH SIDE OF THE BUILDING AT YARD |
| Jan 28, 2004 | B | VIOLATION CLOSED | Not available | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE THE EXTERIOR WALL SOUTH SIDE OF THE BUILDING 2STY AT YARD |
| Jan 28, 2004 | B | VIOLATION CLOSED | Not available | § 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE SOUTH SIDE OF BUILDING AT YARD |
| Jan 28, 2004 | C | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY LOCK INSTALL ON ENTRANCE DOOR TO BUILDING LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING OF THE FRONT PORCH ON THE FIRST FLOOR LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT THE CENTER WEST ROOM ON THE 2ND FLOOR LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT THE REAR NORTH ROOM ON THE 2ND FLOOR LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT THE FRONT ROOM ON THE 2ND FLOOR LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE UNHINGE DOOR TO THE FRONT ROOM ON THE 2ND FLOOR LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING OF THE FRONT ROOM ON THE 2ND FLOOR LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE ENTIRE 2ND FLOOR LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING OF PRIVATE HALL FIRST TO 2ND FLOOR LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING IN THE 2ND FLOOR BATHROOM LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET BOWL 2ND FLOOR BATHROOM LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE WALLS IN THE BATHROOM ON THE 2ND FLOOR LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT WASH BASIN ON THE 2ND FLOOR IN THE BATHROOM LOCATED AT APT 1, 1st STORY |
| Jan 28, 2004 | B | VIOLATION CLOSED | 1 | § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASH BASIN ON THE 2ND FLOOR IN THE BATHROOM LOCATED AT APT 1, 1st STORY |
| Jun 20, 2001 | B | VIOLATION CLOSED | Not available | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR SOUTH WALL AT PUBLIC HALL, 1st STORY |
| Jun 20, 2001 | B | VIOLATION CLOSED | Not available | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING AT PUBLIC HALL, 2nd STORY |