NYC Building Report

Queens Long Island City-Hunters Point

27-19 Thomson Avenue, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

5 records

Date Status Type Summary
Jun 29, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONR'S ORDER: DOB VIOLATION #031224CFA40 201AE REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES BY NYS RDP W/ QEWI & SUBMIT A REPORT TO FACADE VIA EMAIL BY IMMEDIATE AS OF 6.29.2026, NO HANDS O NINSPECTION REPORT SUBMITTED TOFACADE UNIT. REMEDY: COMPLY WITH DOB VIOLATION #031224CFA40201AE IMMEDIATELY
Mar 12, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINT.FACADE&APPURT.ON 2-19-24 FOUND BLDGE SIDING WAS NOT SECURE REMEDY:OWNER TO RETAIN SERV.OF NYS RDP WITH QEWI CERT.&SHEETS CLADDING EXPER.TO INSPECT&EVAL.100%HANDS ON@ALL EXPO.TO DETERM.SAFETY &CAUSE OF DEFECT.FACADE.RDP SHALL CREATE REPORT OF RESULTS OF INSPECT OF DEFECT.SHEETS PNL.FILE&PERMIT ALL WORK.UNSAFE FISP REPORT SUBMIT
Feb 22, 2024 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Feb 20, 2024 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL RECOMMENDATION: INSTALL APPROXIMATELY 170 LINEAR FEET AS FOLLOWS, 80 FT AT 44 DRIVE AND 90 FEET AT THOMSON AVE. TO SAFE GUARD THE PUBLIC AND PROPERTY
Feb 19, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PROVIDE A STRUCTURAL ENGINEER'S REPORT WITHIN *30 DAYS FOR CONDITIONS CITED IN NOTICE OF VIOLATION #PROVIDE A STRUCTURAL ENGINEER'S REPORT WITHIN *30 DAYS FOR CONDITIONS CITED IN NOTICE OF VIOLATION #39106279P.