NYC Building Report

Queens Douglaston-Little Neck

253-01 60 Avenue, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

19 records

Date Status Type Summary
Jul 10, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.THE BLDG SUSTAIND DMG@EXP 1/4 CRNR DUE TO CLLPSD TREE W/PRTLLY CLLPSD ROOF&ATTIC FL.EXT WALLS@EXP1&4 PRTLLY CLLPSD@2ND LEVEL,EXP4WALL BULGNG OUT,&CRCKS ON BRCK VENEER WALLS OBSV.IMMEDIATELY COMPLY W/COMMISSIONER'S ORDER #060826FEU41101KR (CONTROL #350708)DATED 06/08/2026
Jun 9, 2026 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
Jun 8, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.THE BLDG SUSTAIND DMG@EXP1/4 CRNR DUE TO CLLPSD TREE W/PRTLLY CLLPSD ROOF&ATTIC FL.EXT WALLS@EXP1&4 PRTLYL CLLPSD@2ND LEVEL,EXP4 WALL BULGNG OUT,&CRCKS ON BRCK VENEER WALLS OBSV.OWNR TO IMMED:RTAIN NYSPE&DOB REG CNTRCTR TO IMMED:1.PRTLLY DEMO UNSTBLE ROOF/ ATTIC FL/EXP1&4 WALL ELEMNTS AS REQ'D
Jun 8, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUSTAIND DMG@EXP 1/4 CRNR DUE TO CLLPSD TREE W/PRTLLY CLLPSD ROOF&ATTIC FL.EXT WALLS@ EXP1&4 PRTLLY CLLPSD@2NDFL LVL,EXP4WALL BULGNG OUT,&CRCKS ON BRC.OWNR TO RTAIN NYSPE TO EVA THE ENT BLDG&RPAIR UNDR PRMT STRT WRK BY 8/3/26 & COMPLETE/SIGN OFF BY 10/5/6
Jun 6, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NONCOMPLIANT DUE TO DMG @EXP1 & ROOF CAUSED BY FALL EN TREE. SUBSTANTIAL OPENING CREATED IN ROOF ABOVE FL2 UNIT LEAVING RO OF EXPOSED TO ELEMENTS AND SIGNIFICANT CRACKING TO FACADE. IMPACT COMP ROMISED STRUCTURAL INTEGRITY OF WALL AND AFFECTED AREAS VACATE FL1 AND FL2 UNITS
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Dec 1, 2022 V*-DOB VIOLATION - DISMISSED EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Jun 29, 2020 V*-DOB VIOLATION - DISMISSED EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019
Mar 16, 1999 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 16, 1999 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 16, 1999 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Sep 16, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 10, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 10, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 7, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 7, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 7, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 7, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED