Queens Astoria (East)-Woodside (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 12, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNLAWFUL ACT. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. ON MARCH 2, 2021 THE REPSONDENT WAS ORDERED TO PROVIDE SIGNED/SEALED COPY OF THE DESIGN DWGS FOR THE MEZZANINE BY APRIL 5, 2021. AS OF THE DATE OF THIS VIOLATION THE DWGS HAVE NOT BEEN PROVIDED. REMEDY: COMPLY TO CODE |
| May 12, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 2, 2021 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFORMATION. A STEEL FRAMED MEZZANINE AT GROUND LEVEL ZPPEARS TO HAVE BEEN CONSTRUCTED WITHOUT A WORK PERMIT ACCORDING TO A COMPLAINT IN THE BIS SYSTEM. VISITED THE BUILDING ON MARCH 2, 2021 AND WAS NOT PROVIDED ACCESS. REMEDY: PROVIDE A SIGNED/SEALED COPY OF THE DESIGN DWGS FOR THE MEZZANINE BY APRIL 5, 2021 TO CONC. ENFORCEMENT |