Queens Astoria (Central)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 29, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | CORRECTION ACTION PLAN REQ'D(30 DAY CAP)OBSVD @ EXP1 CRACKED/SPALLING MASONRY @ 2ND&3RD FLR CONCRETE BALONY SLABS. @ EXP2 OBSVD CRACKS AND DETERIORATED MORTAR JOINTS NEAR PARAPET NY EXP1/2 CORNER. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG AND TO SUBMIT A CORRECTIVE ACTION PLAN 01/29/2026 |
| Mar 23, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |