Queens Far Rockaway-Bayswater
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 30, 2013 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | DUE TO SEVERE WEATHER CAUSED BY HURRICANE SANDY THE FOLLOWING DAMAGES OCCURED: DUE TO DAMAGES CAUSED BY FLOODING HOTWATER WATER HEATER AND HVAC UNIT REPLACED WITH 1 RHEEM HOTWATER HEATER AND 1 RUDO HVAC UNIT IN THE CELLAR. REMEDY: MAKE ALL NECESSARY REPAIRS AND OBTAIN ALL REQUIRED PERMITS APPLICABLE. MUST OBTAIN PERMIT WITHIN 60 DAYS |