Queens Hollis
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 9, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DOB SUMMONS ISSUED FOR STRUCTURE RENDERED NON COMPLIANT DUE TO EXTENSIVE FIRE, SMOKE AND WATER DAMAGE THROUGHOUT STRUCTURE ALONG WITH MULTIPLE HOLES IN ROOF AND MISSING WINDOWS. |
| Feb 9, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING AN ENGINEER REPORT DUE TO 1ST FLOOR JOIST BEING CUT AND IS UT OF POCKET. ALSO OBSERVED CHARRED JOIST AND TEMPORARY SHORING AT CEL LAR LEVEL. REMEDY ; OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECT IONS@BUILDINGS.NYC.GOV WITHIN 72 HOURS ADDRESSING ALL CONDITIONS W/ P LANS , PHOTOS , RECOMENDING TIME FRAME AND REPAIRS TO BE COMPLETED |
| Feb 9, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT.AT TIME OF INSPECTION OBSERVED A DAMA GED FLOOR JOIST AT CELLAR LEVEL AND WATER DAMAGE . ALSO BROKEN WINDOWS AND OPEN ROOF AT 2ND FLOOR LEANING PROPERTY EXPOSED TO ALL OPEN ELEME NTS VACATE ENTIRE PROPERTY MAINTAIN BUILDING IN CODE COMPLIANT MA NNER |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |