Queens Auburndale
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 21, 2016 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | AT THE TIME OF MY INSPECTION ON THE ABOVE DATE AT 12:15PM I OBSERVED THE INSTALLATION OF WASTE PIPING FOR A KITCHEN SINK INSTALLED IN THE BASEMENT AREA UNDER THE STAIRS.I ALSO OBSERVED AN ADDITIONAL GAS LINE WITH GAS LINE WITH VALVE PENETRATING THE BOILER ROOM AREA.PLANS SHOW 5 GAS CONNECTIONS IN THE BOILER ROOM HOWEVER THEIR ARE 6 CONNECTIONS |