NYC Building Report

Queens Auburndale

201-16 Northern Boulevard, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Jul 21, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 12, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 17, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 23, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 2, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 2, 2020 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM:CONC RETN WALL ACTS AS A RETN STRCT FOR THE HIGHER PKG LOT SLAB ON GRDE.CONC RETN WALL LACK OF WEEPHOLES AND PKG SLAB DOES NOT DRAIN WATR PROPERLY.WATR ACCUMLATD IN PROXIMITY OF WALL & ADD LATERAL HYDROSTATIC PRESSURE.WALL LEAN OUTWRD.OWNR ENGAGE NYSPE CONTR EVALU WHOLE WALL AND PARKING LOT DRAINAGE.OBTAIN PERMTS N/L/T 7/3/20.SIGNOFF N/L/T 8/13/20
Jun 2, 2020 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM:WALL IN STATE OF DISREPAIR.CAPPING OF WALL @EXP 3/4 CORNER NOT IN PLACE FOR APPROX 2'ALLOWING WTER TO ACCUMULATE BTWN THE 2 WYTHE BRCKS WTER FREE THAW CYCLES PEELING&DETCHNG FRM BACK UP LINE OF BRCKS.OWNER ENGAGE NYS PE&CONTRCT TO EVALU WHOLE WALL.OBTAIN PRMTS FOR REPAIRS OF THIS WALL NO LATER THAN 7/3/20.SIGN OFF NO LATER THAN 8/13/20
Aug 24, 2000 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL