Queens Astoria (North)-Ditmars-Steinway
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 4-00828-0147), so they can include other buildings on the same lot.
12 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Dec 24, 2022 | C | NOV SENT OUT | 3 | § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 24, 2022 | A | CERTIFICATION POSTPONMENT GRANTED | 3 | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 24, 2022 | C | CERTIFICATION POSTPONMENT GRANTED | 3 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 24, 2022 | C | CERTIFICATION POSTPONMENT GRANTED | 3 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 24, 2022 | C | CERTIFICATION POSTPONMENT GRANTED | 3 | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 24, 2022 | A | CERTIFICATION POSTPONMENT GRANTED | 3 | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT METAL 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 24, 2022 | B | VIOLATION DISMISSED | 3 | § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE BATH TUB IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 24, 2022 | B | VIOLATION DISMISSED | 3 | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 24, 2022 | B | VIOLATION DISMISSED | 3 | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 24, 2022 | A | CERTIFICATION POSTPONMENT GRANTED | 3 | § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , CEILING IN THE KITCHEN LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Dec 24, 2022 | B | VIOLATION DISMISSED | 3 | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE KITCHEN LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Nov 7, 2019 | I | VIOLATION DISMISSED | Not available | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED. |