DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 5, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROVIDE AT LEAST 4" OF MASONRY BETWEEN COMBUSTIBLE FLOOOR J OIST FRAME INTO A MASONRY PARTY WALL DUE TO DEVIATION FROM PLAN THE CO NDITION MENTIONED WAS OBSERVED REMEDY: STOP ALL WORK EXCEPT CONFORM JOIST TO PLAN |
| Aug 5, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO THE APPROVED DOCUMENTS. MANY DETAILS SHOW EX TERIOR WALL CMU AND SOME SHOW IT TO BE OF WOOD STUDDING. ALSO 4" THIC K CMU WALL INSTALLED OUTSIDE OF 8" THICK PARTY WALL ISW MISSING DETAIL DESCRIBING THIS WORK REMEDY: PROVIDE DETAILS FOR ACTUAL CONDITIONS REMOVE ALL FALSE DETAIL |
| Mar 19, 2009 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |