Queens Fresh Meadows-Utopia
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 24, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 24, 2011 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Mar 10, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO SUPPORT ADJ GROUNDS NOTED: UPON INSPECTION SIDE YARD OF HOU SE #75-71 185 STREET HAS BEEN COLLAPSED DUE TO CONSTRUCTION OPERATION ALSO NOTE THAT PVC FENCE OF ADJ BLDG IS DOWN REMEDY: STOP ALL WORK RESTORE YARD CALL FOR REINSPECTION |
| Dec 13, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION NOTED: UPON INSPECTION AT THE ABOVE ADDRESS SITE WAS VIEWED TO BE PARTIALLY EXCAVATED AT THE NORTH/W CORNER OF SITE SHEER CUT IS AT APPROX 10'-11' SHORING SYSTEM IN FRONT OF CUT IS NOT BACK FILLED IN ORDER TO SUPPORT REMEDY: STOP ALL WORK PROVIDE SUPPORT FOR SIDES AT EXCAVATION |
| Aug 29, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROVIDE APPROVED PLANS |