NYC Building Report

Queens Jamaica Estates-Holliswood

181-18 Union Tpke, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

18 records

Date Status Type Summary
Jan 27, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT AT IME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO ENTIRE STOREFORNT AT EXPOSURE #1 MISSING/REM OVED ALONG WITH MINOR DAMAGE TO INTERIOR CEILING FIRE PROOFING MISSING /RE,OVED REAR GLASS DOOR /CELLAR DOOR DUE TO FIRE FIGHTING OPERATIONS STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER
Jan 27, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT. AT TIME OF INSPECTION OBSERVED SEVER E FIRE , WATER & SMOKE DAMAGE THROUGHOUT . INTERIOR SMOKE DROP CEILING HAS PARTIALLY COLLAPSED ALONG WITH ROOF PENETRAIONS EXPOSING INERIOR TO ELEMENTS. SEVERE CHARRING TO CEILING TO JOIST AT REAR BUILDING MUST BE MAINTAING IN CODE COMPLIANT MANNER
Jan 27, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED MINOR GLASS STOREFRONT ALONG WITH DOOR DAMAGED DUE TO FIRE FIGHTING OPERATIONS.
Jan 27, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED SEVERE FIRE, WATER AND SMOKE DAMAGE THROUGHOUT. INTERIOR FINISHED DROP CEILING HAS PARTIALLY COLLAPSED ALONG WITH ROOF PENETRATIONS EXPOSING INTERIOR TO ELEMENTS. SEVERE CHARRING TO CEILING JOIST AT REAR.
Jan 27, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED SEVERE FIRE DAMAGE TO INTERIOR WHERE INTERIOR DROP CEILING HAS PARTIALLY COLLAPSED. ALSO LARGE SECTIONS OF ROOF MISSING EXPOSING INTERIOR TO ELEMENTS. SEVERE CHARRING TO ROOF JOIST AT REAR.
Jan 27, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO ENTIRE STOREFRONT AT EXPO#1 MISSING/REMOVED ALONG WITH MINOR DAMAGE TO INTERIOR CEILING FIRE PROOFING MISSING/REMOVED, REAR GLASS DOOR AND CELLAR DOOR DUE TO FIRE FIGHTING OPERATIONS.
Jan 22, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION OBSERVED MINOR GLASS STORE DAMAGED DUE TO FIRE FIGHTING OPERATIONS STRUCTURE MUST BE MAINTAIN IN CODE COMPLAINT MANNER
Jan 20, 2019 V*-DOB VIOLATION - DISMISSED P-PLUMBING NONE THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER PLUMBING JOB #421327273 DUE TO SUSPENSION OF MASTER PLUMBERS LICENSE. STOP ALL PLUMBING WORK UNDER ABOVE MENTIONED PERMIT AND OBTAIN A NEW MASTER PLUMBER TO SUPERSEDE THE PLUMBING PERMIT
Oct 7, 2010 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 16, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 16, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 16, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 16, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 16, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 16, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 16, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 16, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Aug 18, 1992 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL