Queens Old Astoria-Hallets Point
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 18, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # Q00541529-I 1 DUE TO SUPERINTENDENT OF CONSTRUCTION WITHDRAWAL |
| Apr 27, 2022 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 27, 2022 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 29, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 30, 2021 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | BACKFILL AND GRADE SITE, PROVIDE 100 CUBIC YARDS OF BACKFILL MATERIAL |
| Jul 9, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK EXCAVATION IN PROGRESS, SITE CONDITIONS NO CONFORMING PLANS INCOMPLETE, MISSING ADJ BUILDING FOUNDATION ELEVATIONS,STOP ALL WORK BACKFILL TO GRADE, BACKFILL TO BEGIN NO LATER THAN 7/9/21 |