Queens Jamaica Estates-Holliswood
177-30 Wexford Terrace, Queens
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
16 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 1, 2023 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Dec 1, 2022 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Jul 7, 2021 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 7, 2021 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 2, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 2, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 2, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 2, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 8, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 17, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURAL PEER REVIEW. OWNER IS TO PROVIDE NAMES OF 3 REPUTABLE NYS PE'S WITH KNOWLEDGE AND EXPERIENCE OF SIMILAR STRUCTURES, TO DOB FOR APPROVAL. 1 OF THE ENGINEERS WILL BE SELECTED TO CARRY-OUT THE PEER REVIEW AND SUBMIT THE PEER REVIEW REPORTS NO LATTER THAN DECEMBER 31, 2016, TO DOB |
| Nov 17, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFORMATION NEEDED FOR CONNECTION OF CANTILEVER BEAM AND BASEPLATES OF STEEL COLUMNS |
| Nov 17, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFO NEEDED FOR CONNECTION OF CANTILEVER BEAM AND BASEPLATE S OF STEEL COLUMNS |
| Nov 17, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFO FOR THE REBAR ARRANGEMENT IN THE CONCRETE SHEAR WALLS MICHAEL KARANTINDIS TO SUBMIT INSPECTION REPORTS, PHOTOS, INCLUDING BUT NOT LIMITED TO: CONCRETE CAST-IN-PLACE, MASONRY, SUBGRADE AND UNDERPINNING REPORTS |
| Nov 17, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFO NEEDED FOR CONNECTION OF CANTILEVER BEAM AND BASEPLATE OF STEEL COLUMES. DAVID REYHAN TO SUBMIT LATEST VERSION OF STRUCTURAL DRAWINGS, SIGNED AND SEALED, FOR REVIEW, BEFORE NOVEMBER 25, 2016 |
| May 12, 2016 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 12, 2016 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |