Queens Jamaica
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 27, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.THE GARAGE EXHIBITED FIRE DMG ON11/2/24 & ERT ISSUED A FULL VACATE ORDER ON 11/2/24.THE GARAGE DOOR WAS BROKEN&ROOF WAS OPE DUE TO FIRE FIGHTNG OPERATION.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 337254 (110824FEU41201ZT)TO REPAIR BUILDING UNDER PERMIT |
| Dec 5, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY SEAL FRONT ENTRY DOOR AND ANY REMAINING OPENINGS IN BLDG AS PER NYC BLDG CODE REQUIREMENTS |
| Nov 14, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: SEAL ALL ACCESSIBLE OPENINGS AND REMOVE DEFECTIVE FIRE ESCAPE M REAR |
| Nov 8, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.THE GARAGE EXHIBITED FIRE DMG ON 11/2/24 &ERT ISSUED A FULL VACATE ORDER ON 11/2/24.THE GARAGE DOOR WAS BROKEN&ROOF WAS OPEN DUE TO FIRE FIGHTNG OPERATION.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,DETERMINE THE STRCTRL STBILITY&PREPARE/FILE RPAIR DWGS.BLDG TO BE RPAIRD UNDR PRMT STRTNG 11/25/24&CMPLTD/SGND OFF12/30 |
| Nov 4, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: TO SECURE THE BLDG & MITIGATE RISKS.ALL OPEINGS & PENETRATIONS SHOULD BE SEALED, INCLUDING ANY ACCESS POINTS CREATED BY THE REMOVED G ARAGE DOORS. THIS ACTION WILL HELP PROTECTTHE STRUCTURE FROM FURTHER D AMAGE & PREVENT UNAUTHORIZED ENTRY, ENSURE PUBLIC SAFETY UNTIL PERMAMN ENT REPAIRS CAN BE UNDERTAKEN |
| Nov 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO ENTIRE STRUCTURE, FIRE, WATER AND SMOKE DAMAGE SEVERE CHARRING OF RAFTERS DUE TO FIRE. |