Queens Fresh Meadows-Utopia
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 8, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN-OBSVD SEVERAL STEP CRACKS AND CRACKED MORTAR AT VARIOUS LOCATIONS INCLUD HORIZONTAL CRACKS OVER MAIN ENTRANCE, STEP CRACKS OVER SIDE DOOR ENTRANCE AND ABOVE WINDOWS AT EXP3. OWNER TO IMMED RETAIN DESIGN PROF IN GOOD STANDING WITH DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN |