NYC Building Report

Queens Ridgewood

1654 Putnam Avenue, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

12 records

Date Status Type Summary
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
May 31, 2017 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 24, 2017 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
May 18, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 4, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 4, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Apr 29, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONERS ORDER(022316FEU40501JH)ON 2.23.16 YOU WERE SERVED & REQUIRED TO ENGAGE A LICENSED P.E. TO PREPARE & FILE DRAWINGS TO EFFECT REPAIRS & TO BEGIN WORK.THIS WORK WAS NOT DONE REMEDY: COMPLY WITH COMMISSIONERS ORDER
Feb 23, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FM. NUMEROUS WOOD JOISTS HAVE HOLES BORED THROUGH APPROX 40%-50% OF THE TOTAL DEPTH WHICH COMPROMISES THE STABILITY OF THE FLOOR IN THIS AREA AND IS CONTRARY TO CODE SECTION 2308.8.2 REMEDY:OWNER TO ENGAGE LIC PE ENG'R TO PREPARE DWGS TO EFFECT REPAIRS DWGS TO BE FILED WITH THE DOB NO LATER THAN 3/2/16 WRK UNDER PERMIT TO B/GIN NO LTR 3/7/2016
Feb 11, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jan 19, 2007 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Sep 16, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED