Queens Far Rockaway-Bayswater
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 4-15817-0082), so they can include other buildings on the same lot.
57 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Jan 13, 2017 | C | VIOLATION CLOSED | 1FL | § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF LEAKING BASEBOARD HEATER IN THE 5th ROOM FROM EAST LOCATED AT APT 1FL, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Aug 13, 2015 | B | VIOLATION CLOSED | 1 | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WINDOW. TOP IN THE 1st BEDROOM FROM NORTH LOCATED AT APT 1, 1st STORY |
| Aug 13, 2015 | B | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE SINK CABINET IN THE KITCHEN LOCATED AT APT 1, 1st STORY |
| Aug 13, 2015 | B | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE TOP AND BOTTOM WINDOW SASH IN THE 1st BEDROOM FROM NORTH LOCATED AT APT 1, 1st STORY |
| Aug 13, 2015 | A | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CRACK WALLS IN THE 1st LIVING ROOM FROM EAST LOCATED AT APT 1, 1st STORY |
| Jan 15, 2008 | B | VIOLATION CLOSED | 1 | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY |
| Apr 6, 2007 | C | VIOLATION CLOSED | 1 | § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY |