Queens Baisley Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
3 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 28, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT, NOTED: AT CELLAR LEVEL. OBSERVED FULL HEIGHT PARTITIONS CREATING TWO BEDROOMS AND KITCHEN. INSTALLED WATER AND WASTE LINES FOR RESIDENTIAL SINK AND GAS LINE FOR GAS STOVE. |
| Mar 28, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OCCUPANCY CONTRARY TO THAT ALLOWED BY DEPARTMENT RECORDS. NOTED: AT CELLAR LEVEL. CELLAR IS TO BE FOR STORAGE AND BOILER ROOM. AT TIME OF INSPECTION, CELLAR HAS BEEN CONVERTED TO TWO BEDROOMS AND FULL KITCHEN (RESIDENTIAL SINK AND GAS STOVE). NO C OF O ISSUED FOR THIS CONVERSION. NO SECOND MEANS OF EGRESS. |
| Nov 11, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |