Queens Baisley Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 30, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 24, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 12, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/ A COMMISSIONERS ORDER. YOU WERE SERVED W/ A COMMISSIONERS ORDER DATED 3/23/16 REQUIRING YOU TO ENGAGE A LIC PROF TO PREPARE DWGS TO EFFECT REPAIRS TO THE SAGGING&DETERIORATED 2ND FL BALCONY.THIS WORK WAS NOT DONE.REMEDY:COMPLY W/COMMISSIONERS ORDER |
| Mar 23, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FM.BALCONY WOOD MEMBFERS AND SHEATHING HAVE WATER DAMAGE AND ROT.EXP#4 BUILT UP EDGE MEMBER SPLIT APPROX 18' FROM FACE OF BLDG. EXTENSIVE WATER DAMAGE AND ROT AT EXP#2 EDGE OF THE BALCONY. REMEDY:OWNER TO ENGAGE LIC PE TO PREPARE DWGS TO EFFECT REPAIRS/DWGS TO BE FILED WITH DOB NO LATER THAN 4/4/16 WORK TO BEGIN NO LATER THAN 4/18/16 |
| Mar 23, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 14, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Nov 7, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Oct 27, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |