Queens Murray Hill-Broadway Flushing
149-40 Roosevelt Avenue, Queens
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 16, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BUILDING SUSTAINED EXTENSIVE STRUCTURAL DAMAGE DUE TO FIRE, WITH CHARRED WOOD JOISTS, FRAMING, HOLES IN ROOF & WINDOWS BOARDED UP WITH PLYWOOD. UNPERMITTED SHORING WORK DONE AT CELLAR, AND AT EXTERIOR EXP#1 FRONT PORCH. |
| Dec 27, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD EXP1HEAVILY DMGD BY FIRE,W/STRCTRL MEMBERS CHARRD AND/OR MISSNG.OBSERVED DMG TO FRNT ENTRY STEPS&PORCH.OBSRVD EXP2WALL OPEN TO THE ELEMENTS.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #112924CFEU40701AK(CONTROL #341786) IMMEDIATELY |
| Nov 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD EXP1HEAVILY DMGD BY FIRE,W/STRCTRL MEMBER CHARRD AND/OR MISSNG.OBSRVD DMG TO FRNT ENTRY STEPS&PORCH.OBSRVD EXP2WALL OPEN TO THE ELEMENTS.OWNR TO ENGAGE NYSPE& ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR OR DEMO UNDR PRMT.FILE FOR PRMTS BY 12/27/24.SGN OFF PRMTS BY 2/7/25 |
| Nov 29, 2024 | V%-DOB VIOLATION | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Oct 28, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: SEAL ALL ACCESSIBLE OPENINGS TO SECURE AGAINST UNAUTHORIZED AC CESS AND TO SAFEGUARD PUBLIC AND PROPERTY |
| Oct 28, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLAINT. BUILDING SUSTAINED EXTENSIVE STRUCTURAL DAMAGE CAUSED BY FIRE CONSISTING OF CHARRED WOOD JOISTS, OPEN ROOF, OPEN CEILING, MISSING WINDOWS, SMOKE AND WATER DAMAGE THROUGHOUT. |