Queens Far Rockaway-Bayswater
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 15, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.OBSRVD BLDG IN A STATE OF DISREPAIR W/CHARRNG@EXPS 2-3,ROOF,MELTD SIDNG2EXPS2-3,&WNDWS OUT AT EXPS103 2NDFL DUE TO A FIRE WHICH OCCURRED ON 3/12/24.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION # 061224CFEU41401AK (CONTROL#343735) IMMEDIATELY |
| Jun 12, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.OBSRVD BLDG IN A STATE OF DISREPAIR W/CHARRNG@EXPS 203,ROOF,MELTD SIDNG@EXP2-3,&WNDWS OUT AT EXPS103 2NDFL DUE TO A FIRE WHICH OCCURRED ON 3/12/24.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.OBTN PRMTS BY 7/12/24.SGN OFF RPAIRS BY 9/12 |
| Apr 15, 2024 | V*-DOB VIOLATION - DISMISSED | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Mar 12, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLAINT. AT TIME OF INSPECTION OBSERVED BUILDING SUSTAINED FIRE DAMAGE WHERE SMOKE AND WATER DAMAGED ,WINDOWS AND DOORS OUT, WALLS AND CEILING DAMAGED, ROOF OPEN TO THE ELEMENTS, JOIST CHARRED. VACATE ENTIRE BUILDING. |
| Mar 12, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION OBSERVED BUILDING SUSTAINED FIRE DAMAGE WHERE SMOKE AND WATER DAMAGED ,WINDOWS AND DOORS OUT, WALLS AND CEILING DAMAGED, ROOF OPEN TO THE ELEMENTS, JOIST CHARRED. |