Queens Jamaica Hills-Briarwood
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 29, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED 1 STORY REAR EXTENSION, (CMU FOUNDATION, WOODFRAME). NON- CONTINUOUS/SPLICED ROOF JOISTS. APPROX 18X22 FT STRUCTURE IS UNDESIGNED, UNINSPECTED, AND HAZARDOUS. REMEDY: RETAIN NYS PE FOR TEMP SHORING/BRACING. SUBMIT DRWGS BY 1/2/25. STRT BY 1/7/26. SEND UP DATES TO CONSTRUCTION SAFETY ENGINEERING |
| Dec 29, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED 1-STORY REAR EXTENSION APPROX 18X22 FT W. CMU WALLS & WOOD FRAMING FOUND UNINSPECTED & UNDESIGNED. STRUCTURE POSES HAZARD TO .LIFE AND PROPERTY. REMEDY: RETAIN NYS PE FOR WEEKLY STABILITY RPTS FIRST DUE 1/2/26 EMAIL SIGNED/SEALED REPORTS W/ PHOTOS TO CSE WEEKLY |
| Dec 24, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED UNPERMITTED/UNDOCUMENTED HORIZONTAL AND VERTICAL EXTENSION IN THE BACK OF THE BUILDING APPROXIMATELY 18' X15' X10' HIGH WITH WINDOWS AND ROOF. JOB IS APPROXIMATELY 60% COMPLETED. THIS UNDOCUMENTED/UNPLANNED STRUCTURAL WORK COMPROMISE THE STABILITY OF THE BUILDING AND MAKES IT UNSAFE TO OCCUPY. |
| Dec 24, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED UNPERMITTED/UNDOCUMENTED/UNPLANNED HORIZONTAL AND VERTICAL EXTENSION IN THE BACK OF THE BUILDING APPROXIMATELY18' X 15' X10' HIGH WITH WINDOWS AND ROOF. JOB IS APPROXIMATELY 60% COMPLETED. NO PERMIT/PLANS FOR THIS STRUCTURAL WORK AT THE TIME OF INSPECTION. |