Queens Baisley Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 24, 2022 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | FULLY DEMOLISH THE BUILDING |
| May 17, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-DUE TO FIRE 3/29/22 EXP3 WAS FIRE DMGD W/NEARLY ENTIRE SHEATHING BURNED/DETACHED.FIRE DAMAGE TO EXP3 WOOD STUDS @1 & 2FLRSEXP2&4 SIDING DMGD.INADQTE TEMP TARPING INSTALLD @EXP3 FROM GRADE-ROOF OWNER TO RTAIN NYSPE-EVALU ENTIRE BLDG & FILE RPR DWGS.BLDG TO BE RPRD UNDR PRMT STRTNG BY 6/27/22 &COMPLTD BY 7/29/2022 |
| Mar 31, 2022 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL A TIGHT BOARD CONSTRUCTION FENCE AT EXPOSURE 2 REAR APPROX. 50 L/FT AND EXPOSURE 3 APPROXIMATELY 45 L/FT TO SAFEGUARD THE PUBLIC AND .PROPERTY |
| Mar 29, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE AND FIRE FIGHTING OPERATION DAMAGES: SUBSTANTIAL FIRE DAMAGES TO THE ENTIRE GARAGE WITH CHARRED JOISTS. WALLS, DOORS, AND WINDOWS REMOVED |
| Mar 29, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE AND FIRE FIGHTING OPERATION DAMAGES: 2 STORY RESIDENTIAL STRUCTURE SUSTAINED SUBSTANTIAL FIRE DAMAGES TO THE REAR OF THE PREMISES ALONG WITH FIRE FIGHTING OPERATIONS |
| Sep 10, 1992 | VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |