Queens Springfield Gardens (North)-Rochdale Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1449 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 29, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONR'S ORDER: DOB VIOLATION #031924CFA41 203AB REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES BY REG DESIGN PRO AND SUBMIT A REPORT TO FACADE VIA EMAIL BY 4/15/26 AS OF 6/29/2026, NO HANDS ON INSPECTION REPORT SUBMITTED TO FACADE UNIT. REMEDY: COMPLY WITH DOB VIOLATION #031924CFA41203AB IMMEDIATELY |
| Dec 15, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT THE TIME OF INSPECTION,I OBSERVED ON EXP1 SOUTH ELEV,SPALLED ROOF EAVE AT MULTIPLE LOCATIONS,CRACKED BALCONY GLASS RAILS ON 10TH FL.EXP2,SPALLIN G BALCONY SLAB ON 10TH FL.EXP3 & 4 SPALLING ROOF EAVE AT MULTIPLE LOCA TIONS.EXP4 SPALLING BALCONY SLAB.REMEDY:REPAIR AND/OR REPLACE DAMAGE |
| Dec 15, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 EAST ELEV,SPALLING CONCRETE EA VE AT SEVERAL LOCATION,CRACKED BALCONY GLASS RAIL PANELS.EXP2 SOUTH EL EV SPALLING BALCONY SLAB,SPALLING EAVE.REMEDY:REPAIR AND/OR REPLACE DA MAGED EAVE AND CRACKED GLASS PANELS |
| Mar 5, 2025 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 5, 2025 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 11, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER. VACATE FACADE BALCONIES DUE TO CRACKED GLASS RAILING @ TOWER B APT #7F & TOWER C APT #7D & 10D ALSO VACATE SET-BACK FIRST LVL BTW TOWER B & TOWER C AT WEST ELEV DUE TO LOOSE/CRACKED CON- RETE ABOVE. REMEDY: VACATE BALCONIES AT APT #7F AND 7D AND 10D ALSO SETBACK FIRST LVL ROOF @ WEST ELEV |
| Dec 11, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 26, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 13, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 13, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 1, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER DUE TO MISSING GLASS RAILINGS AT TOWER A - APT 4G, TOWER B - APT. 4G AND TOWER C - APT #10E. REMEDY: FULLY VACATE BALCONIES FOR TOWER A - APT. 4G, TOWER B - APT. 4G AND TOWER C - APT 10E |
| Oct 1, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER DUE TO THE MISSING GLASS RAILINGS AT TOWER B APARTMENTS #S 12A, 7E AND 11E. REMEDY: FULLY VACATE BALCONIES FOR TOWER B APARTMENTS #12A, 7E AND 11E |
| Oct 1, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER DUE TO THE MISSING GLASS RAILINGS AT TOWER A - APT10A; TOWER B - APT12A AND TOWER C - APT 12E. REMEDY: FULLY VACATE BALCONIES FOR TOWER A - APT. 10A, TOWER B - APT. 12A AND TOWER C - APT 12E |
| Sep 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED. AT EXP#2 AND 4 MISSING BALCONY RAILING GLASS AT MULTIPLE LOCATION. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC AND REMOVE/REPAIR ANY BROKEN GLASS AND LOOSE MATERIALS AS PER IRCNY 103-04 |
| Sep 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE OBSERVED:AT EXP#2 & 4 BROKEN/MISSING BALCONY RAILING GLASS AT MULTIPLE LOCATIONS. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES TO SECURE/PROTECT THE PUBLIC AND REPAIR ANY BROKEN GLASS AND LOOSE MATERIALS AS PER IRCNY 103-04 |
| Sep 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE. AT EXP 2 & 4 ELEVATION 8,12,26 MISSING BALCONY RAILING GLASS. AT EXP 1 ELEVATION 27 5FL OBSERVED BROKEN GLASS WINDOW. REMEDY:IMMEDIATELY PROVIDE SAFETY MEASUR TO SECURE/PROTECT THE PUBLIC AND REMOVE/REPAIR ANY BROKEN GLASS OR LOOSE MATERIALS AS PER IRCNY 103-04 |
| Sep 12, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 30, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER. OBSERVED: CRACKED/SPALLING BALCONY SLABS AND BROKEN GLASS RAILINGS AT MULTIPLE LOCATIONS THROUGHOUT ENTIRE FACADE REMEDY: VACATE ALL FACADE BALCONIES |
| Aug 27, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT EXP2 (SOUTH ELEVATION TOWER B LINE E) SPALLING/CRACKED CONCRETE SLAB @ ROOF LEVEL. ALSO BROKEN GLASS RAILING AT BALCONY MULTIPLE LOCATIONS. REMEDY: IMMEDIATELY PROVIDE SAFETY MEASURES AT EXP 2 & 4 SOUTH & NORTH ELEV TO SECURE/PROTECT THE PUBLIC & REMOVE ALL LOOSE MATERIALS |
| Jul 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES DUE TO BUILDING FILING AS SWARMP CONDITION & QEWI RECOMMENDATION FOR COMPLETED REPAIR SWARMP CONDITION BY DATE 02/19/2027.REMEDY: THE OWNER HAS TO COMPLY & REPAID THE FACADES BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027.) |
| Jul 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES. DUE TO BUILDING FILING AS SWARMP CONDITION & QEWI RECOMMENATION FOR COMPLETED REPAIR SWARMP DONDITION DATE BY 02/19/2027.REMEDY: THE OWNER HAS TO COMPLY AND REPAIR THE FACADE BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027) |
| Jul 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES. DUE TO BUILDING FIX AS SWARMP CONDITION & QEWI RECOMMENDATIONS FOR COMPLETED REPAIR SWARMP CONDITION DATE BY 02/19/2027. REMEDY: THE OWNER HAS TO COMPLY AND REPAIR THE FACADES BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027) |
| Jul 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR WALL & APPURTENANCES. DUE TO BUILDING FILING AS SWARMP CONDITION & QEWI RECOMMENDATION FOR COMPLETED REPAIR SWARMP CONDITION DATE BY 02/19/2027. REMEDY: THE OWNER HAS TO COMPLY AND REPAIR THE FACADES BY THE DATE THEY PROVIDED IN THE FISP REPORT (02/19/2027) |
| Jul 12, 2024 | V-DOB VIOLATION - ACTIVE | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | CYCLE 9A UNSAFE REPORT FILED |
| Jun 26, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 15, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 14, 2024 | V-DOB VIOLATION - ACTIVE | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | CYCLE 9A UNSAFE REPORT FILED |
| Mar 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO COLLAPSING MASONRY BRICKS AT SOUTH ELEVATI ON EXPOSURE#4 BETWEEN SIXTH AND SEVENTH FLOORS.REMEDY:THE OWNER IS TO IMMEDIATELY PROVIDE SIDEWALK SHED AND SECURED FENCES AROUND ALL IMPACT ED AREAS |
| Mar 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN FACADE.OBSERVED COLLAPSED MASONRY BRICKS AR SOUTH EXP#4 BETWEEN 6TH AND 7TH FLOOR.THE OWNER IS TO IMMEDIATELY RETAIN SER VICE OF REG DESIGN PRO WITH QEWI CERTIFICATION AND MASONRY BRICK FACAD E EXPERIENCE TO INSPECT & EVALUATE 100% HANDS ON.REMEDY:INSTALL PUBLIC PROTECTION.SUBMIT REPORT TO FACADES@BUILDINGS.NYC.GOV BY 4/15/2024 |
| Mar 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER 3/19/2024 OBSERVED COLLAPSED MASONRY BRICK AND MO RTAR AT SOUTH ELEVATION EXP#4 AT BETWEEN 6TH AND 7TH FLOOR OVER SOUTH YARD.THESE CONDITIONS HAVE THEREFORE MADE THE SOUTH YARD UNABLE TO BE OCCUPIED EXCEPT IN EMERGENCY SITUATIONS.REMEDY:IMMEDIATELY VACATE ENTI RE SOUTH YARD |
| Mar 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER 3/19/2024 OBSERVED CRACKED/SPALLED CONCRETE BALCO NY SLABS AT MULTIPLE LOCATIONS.THESE CONDITIONS HAVE THEREFORE MADE TH E ENTIRE BALCONIES UNABLE TO BE OCCUPIED.REMEDY:IMMEDIATELY VACATE ENT IRE BALCONIES |
| Mar 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT THE TIME OF INSPECTION OBSERVED.MISSING METAL PARAPET RAILING AT THE ROOF LEVEL.REMEDY:IMMEID ATELY REPAIR PARAPET RAILING |
| Mar 7, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT CORNER OF EXP. 3 AND 4 DISLODGED BRICKS (APPROX. 8'X 6')THAT HAVE FALLEN TO GRADE. |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |