Queens Flushing-Willets Point
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 15, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#348135 VIO#032626PI40701AG DATED 03/26/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 04/27/26. AS OF 05/15/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348135 &VIO#032626PI40701AG |
| Mar 26, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-OBSVD @ EXP1 MULT STUCCO MASONRY HAIRLINE CRACKS THROUGHOUT THE ENTIRE EXP W/VERT CMU CRACK PRESENT @ ENTRY DOOR OPENING. EXP2 HAS DIAGNOL STEP CRACKS & HORIZONTAL CRACKING ON CMU MASONRY IN VARIOUS LOCATIONS. OWNR TO IMMED RETAIN REG PROF TO EVAL ENTIE BLDG & SUBMIT A CORRECTIVE ACTION PLAN |
| Feb 25, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # 421606710 DUE TO SPECIAL / PROGRESS INSPECTOR CLAIMED FRAUDULENT FILING. UNABLE TO DETERMINE THE PERCENTAGE OF WORK COMPLETED. |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |