Queens Flushing-Willets Point
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
20 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 1, 2019 | V*-DOB VIOLATION - DISMISSED | RWNRF-RETAINING WALL NONE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 |
| Aug 28, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BC SWO ISSUED FOR #420896775 DUE TO SUPERINTENDENT OF CONSTRUCTION WITHDRAWAL. |
| Jan 9, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 9, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 26, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BORO COMMISSIONER HAS ISSUED STOP WORK ORDER FOR # 420896775 DUE TO GC NOT AUTHORIZING PERMIT |
| Apr 5, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 17, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BOROUGH COMMISSIONER HAS ISSUED LETTER OF INTENT TO REVOKE PERMIT # 42 0842048 |
| Jun 15, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 15, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 15, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 20, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Nov 19, 2013 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | EGNCY-EMERGENCY NONE |
| Jan 30, 2013 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 30, 2013 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 15, 2010 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 4, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | MISCELLANEOUS VIOLATIONS FAILURE TO PRESERVE AND PROTECT ADJOINING STR UCTURE AFFECTED BY EXCAVATION OPERATION NOTED AT TIME OF EXCAVATION CO NTRACTOR FAILED TO FOLLOW SEQUANCE OF OPERATIONS CONTRACTOR INSTALLED SHEETING SHORING BEFORE ADJACENT BUILDING WAS UNDERPINNED ADJACENT BUI LDING HAS LARGE CRACK REMEDY: COMPLY WITH NOTICE PROVIDE APPROVED SHOR |
| May 28, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO FILE TECANICAL REPORT OF RESPONSIBILITY CTR-D FOR STRUCTURA L SAFETY AS REQUIRED - BY BC 1704.19 REMEDY: FILE TR--1. FAX COPY TO SEPEX 212-442-3925 |
| May 28, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | INADEQUATE DETAILS ON APPROVED CONSTRUCTION DRAWINGS/SPECS FOR ANCHORAGE OF MASONRY WALLS TO FOUNDATION AND INTERMEDIATE FLOORS REMEDY: PROVIDE, SHOP DRAWING BY PE STAMPED & SIGN DATED WITH |
| May 21, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK FAILURE TO COMPLY WITH AN ORDER TO STOP WORK BY THE DEPT NOTED SITE IS WITH PILES & LAGGING AT EXP #3 & 4 NEW LAGGING HAS BEEN INSTALLED AT EXP #2 & 3 REMEDY: STOP ALL WORK COMPLY WITH NOTICE OF VIOLATION CALL 212 442-1544 |
| Jun 20, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO SAFEGUARD PUBLIC AND PROPERTY AFFECTED BY CONSTRUCTION OPER ATIONS REAR CONSTRUCTION FENCE ABOVE EXCAVATED AREA IS MISSING ADJOINI NG OCCUPIED PROPERIES EXP 2,3,4 FRONT GATE IS OFF OF PERIMETER FENCE A PPROX 16' WIDE OPENING EXISTS W OUT PROPER ACCESSABILITY REMEDY: STOP ALL WORK EXCEPT TO INSTALL ALL FENCE GATE |