Queens Richmond Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
1 record
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 24, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN SAFE CONDITION-REAR WALL AT 130-41 91 AVESUFFERED A GAS EXPLOSION ON 10/24/2022. EXP3 PARAPET WALL WAS CRACKEDADJ TO THE REAR CORNER OF 130-41 ABOVE THE 130-41 SIDEYARD OWNER TO REATIN NYSPE TO EVALUATE ENTORE BLDG & FILE REPAIR DWGS.BLDG TO BE REPAIRED UNDER PERMIT STARTING DEC 05,2022 &CMPLETE BY 1/13/23 |