Queens Baisley Park
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 19, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#348530 VIO#041326PI41202HZ DATED 04/13/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 04/20/26. AS OF 05/19/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#348530 & VIO#041326PI41202HZ |
| May 19, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#348529 VIO#041326PI41201HZ DATED 04/13/26 REQUIRING OWNER TO PRIVE A CORRECTIVE ACTION PLANY BY 04/30/26. AS OF 05/19/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER COONTROL#348529 & DOB#041326PI41201HZ |
| Apr 13, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-PLYWOOD ON EXTERIOR IS WATER SOAKED AND ROTTED ALSON ROOF IS DETERIORATED AND PARTIALLY COLLAPSE. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 04/20/2026 |
| Apr 13, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FULL VACATE ORDER-FTM GARAGE IN CODE COMPLIANT MANNER-COLLAPSE ROOF TOWARD THE INSIDE THE BLDG. EXTERIOR WALLA ARE DETERIORATED AND AT RISK OF COLLAPSE. FULLY VACATE THE GARAGE AND SURROUND AREA OF EXP3&4 UNTIL HAZ CONDITIONS HAVE BEEN REMEDIED |
| Apr 13, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN REQ'D-PLYWOOD ON EXTERIOR IS WATER SOAKED AND ROTTED ALSO ROOF IS DETERIORATED AND PARTIALLY COLLAPSED. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY 04/20/2026 |
| Apr 13, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FULL VACATE ORDER-FTM REAR STRUCTURE IN CODE COMPLIANT MANNER- DETERIORATED WALLS ON EXP2 AND PARTIALLY COLLAPSE ROOF. FULLY VACATE THE REAR BLDG AND SURROUNDING AREAS UNTIL HAZ AREAS ARE REMEDIED |