NYC Building Report

Queens Baisley Park

130-13 146 Street, Queens

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 4-12109-0031), so they can include other buildings on the same lot.

6 records

Date Class Status Apartment Summary
Aug 25, 2024 A INVALID CERTIFICATION 1R § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Aug 25, 2024 B NOV CERTIFIED LATE 1R § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK OVER CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Aug 25, 2024 B NOV CERTIFIED LATE 1R § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Aug 25, 2024 B NOV CERTIFIED LATE 1R HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Aug 25, 2024 A INVALID CERTIFICATION 1R § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Aug 25, 2024 B NOV CERTIFIED LATE 1R § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH