Queens Breezy Point-Belle Harbor-Rockaway Park-Broad Channel
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 4, 2017 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO COMPLY W/COMMISSIONERS ORDER, DOB VIO#120916FEU41401AD ISSUED 12/9/16 TO OBTAIN PERM&SUBSTANTIALLY COMPLETE SHORING/REPAIR WORK AT ENTIRE EAST FACADE BY 2/15/17.NO PERM WERE APPLIED FOR&NO REPAIR WORK WAS PERFORMED.REMEDY:COMPLY W/REF COMMISSIONERS ORDER IMMED-APPLY FOR PERM&REMEDIATE DEFECTIVE EAST FACADE WALL CONDITIONS IMMED |
| May 3, 2017 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 23, 2017 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | FTM / FENCE |
| Mar 8, 2017 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 9, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FM BLDG.CRACKING&SHIFTING BRICK FACADE WALL ON EASTSIDE OF BLDG.THERE IS HORIZONTAL CRACK ALONG ENTIRE EAST FACADE AT 2ND FL LEVEL.BRICK IS SHIFTED ABOUT 10INCHES ALONG HORIZONTAL CRACK,CREATING BULGE.REMEDY: OWNER HIRE NYSPE PROF ENGR EVAL STRL STAB OF WALL&MAKE RECOMMENDATION FOR SHORING/REPAIRS BY 1/6/17.FILE PLAN&OBTAIN PERMIT BY 1/20/17 |