NYC Building Report

Queens South Ozone Park

124-10 Liberty Avenue, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

5 records

Date Status Type Summary
Aug 5, 2026 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL @EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY& HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHED.OWNR TO ENGAGE NYSPE TO PRVDE WRITTEN MEANS&METHDS
Aug 5, 2026 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL@ EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY & HEAVILY CRCKD ROOF MEMBRANE REPEATEDLY TORN&PATCHED.SBMT ANNUAL PARAPET OBSVTN RPRT FOR 2025 TO BE RECEIVED BY DOB NO LATER THAN 8/19/ 26 TO ANKMIOTEK@BUILDINGS.NYC.GOV
Aug 5, 2026 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL@ EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY& HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHED.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&PERM RPAIR UNDR PRMT.FILE FOR PRMTS BY 9/7/26.SGN OFF RPAIR
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 7, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED