124-08A Liberty Avenue, Queens
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
15 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 5, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL @EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHED.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO DEMO THE ENT EXP1 PARAPT UNDR EMRGNCY WRK NYSPE TO PRVDE WRITTEN MEANS&METHD |
| Aug 5, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL@ EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY& HEAVILY CRCKD ROOF MEMBRANE REPEATEDLY TORN & PATCHED.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&PERM RPAIR UNDR PRMT.FILE FOR PRMTS BY 9/7/26.SGN OFF REPAIR |
| Aug 5, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPCTN,OBSRVD MASONRY PARAPT WALL@EXP1 TO BE IN A STATE IF SEVERE DISREPAIR,LEANING SIGNIFICANTLY&HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHD SUGGESTNG CONT OUTW.SBMT ANNUAL PARAPET OBSRVTN RPRT FOR 2025 TO BE RECEIVED BY DOB NO LATER THAN 8/19/26 TO ANKMIOTEK@BUILDINGS.NYC.GOV |
| Aug 5, 2026 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | .REMEDY: ERECT CONSTRUCTION FENCE |
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Apr 2, 2012 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 31, 2005 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 28, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |