NYC Building Report

Queens South Ozone Park

124-08 Liberty Avenue, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
Aug 5, 2026 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.AT TIME OF INSPCTN,OBSRVD MASONRY PARAPT WALL@EXP1 TO BE IN A STATE OF SEVERE DISREPAIR.LEANING SIGNIFICANTLY &HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHD SUGGESTNG CONT OUTW.SBMT ANNUAL PARAPET OBSRVTN RPRT FOR 2025 TO BE RECEIVED BY DOB NO LATER THAN 8/19/26 TO ANKMIOTEK@BUILDINGS.NYC.GOV
Aug 5, 2026 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.AT TIME OF INSPECTION.AT TIME OF INSPECTION.OBSRVD MASONRY PARAPET WALL@EXP1 TO BE IN A STATE OF SEVERE DISREPAIR,LEANING SIGNIFICANTLY&HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHED.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&PERM RPAIR UNDR PRMT.FILE FOR PRMTS BY 9/7/26.SGN OFF REPAIR
Aug 5, 2026 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.AT TIME OF INSPECTION,OBSRVD MASONRY PARAPET WALL @EXP1 TO BE IN A STATE OF SEVERE DISRPAIR,LEANING SIGNIFICANTLY& HEAVILY CRCKD.ROOF MEMBRANE REPEATEDLY TORN&PATCHD SUGGESTNG CONTINUAL OUTWRD MOVEMNT.PARAPET IS@RISK OF CLLPSE&POSES A DANGER TO THE PUBLIC OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO DEMO THE ENT EXP1PARAPT UNDR EW
Aug 5, 2026 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REMEDY: ERECT CONSTRUCTION FENCE
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Jan 31, 2005 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 28, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED