NYC Building Report

Queens Kew Gardens

122-31 Metropolitan Avenue, Queens

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Jul 31, 2019 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Aug 15, 2012 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 8, 2010 V*-DOB VIOLATION - DISMISSED VCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED