Queens Kew Gardens
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 4-03348-0028), so they can include other buildings on the same lot.
102 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Jun 12, 2025 | A | VIOLATION DISMISSED | Not available | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Jul 27, 2022 | B | NOV SENT OUT | 3E | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'', 1st FROM EAST AT SOUTH |
| Jul 27, 2022 | B | NOV SENT OUT | 3C | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'', 1st FROM EAST AT SOUTH |
| Jul 27, 2022 | B | NOV SENT OUT | 3A | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''SOUTH'', 1st FROM EAST AT SOUTH |
| Jul 27, 2022 | B | NOV SENT OUT | 2E | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH'', 1st FROM EAST AT SOUTH |
| Jul 27, 2022 | B | CERTIFICATION POSTPONMENT GRANTED | 1T | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1T, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'', 1st FROM WEST AT NORTH |
| Jul 27, 2022 | B | NOV SENT OUT | 1R | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1R, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'', 1st FROM WEST AT NORTH |
| Jul 27, 2022 | B | NOV SENT OUT | 1G | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1G, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'', 1st FROM EAST AT SOUTH |
| Jul 20, 2022 | B | CERTIFICATION POSTPONMENT DENIED | 1Q | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1Q, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jul 20, 2022 | B | INVALID CERTIFICATION | 2U | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2U, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Jul 20, 2022 | B | NOV SENT OUT | 2R | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2R, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Jul 20, 2022 | B | INVALID CERTIFICATION | 3T | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3T, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jul 20, 2022 | B | NOV SENT OUT | 3Q | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3Q, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jul 20, 2022 | B | NOV SENT OUT | 3P | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3P, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jul 20, 2022 | B | NOV SENT OUT | 4T | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4T, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Jul 20, 2022 | B | INVALID CERTIFICATION | 4N | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Jul 20, 2022 | B | NOV SENT OUT | 5Q | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5Q, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jul 20, 2022 | B | NOV SENT OUT | 6R | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6R, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Jul 20, 2022 | B | NOV SENT OUT | 6Q | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6Q, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jul 20, 2022 | B | INVALID CERTIFICATION | 6P | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jul 20, 2022 | B | CERTIFICATION POSTPONMENT DENIED | 6N | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6N, 6th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Jul 12, 2022 | A | VIOLATION DISMISSED | 6K | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH, THE FOYER , THE BATHROOM LOCATED AT APT 6K, 6th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | A | VIOLATION DISMISSED | 1E | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 3rd ROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | C | NOV SENT OUT | 1E | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | C | NOV SENT OUT | 5A | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | A | VIOLATION DISMISSED | 5A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | C | VIOLATION DISMISSED | 1E | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Jul 12, 2022 | B | NOV SENT OUT | 6K | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6K, 6th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Jul 12, 2022 | B | CERTIFICATION POSTPONMENT DENIED | 6A | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6A, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Jul 12, 2022 | B | CERTIFICATION POSTPONMENT DENIED | 4D | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4D, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Jul 12, 2022 | B | NOV SENT OUT | 3K | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3K, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Jul 12, 2022 | B | CERTIFICATION POSTPONMENT DENIED | 3F | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Jul 12, 2022 | B | CERTIFICATION POSTPONMENT DENIED | 2J | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2J, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Jul 12, 2022 | B | CERTIFICATION POSTPONMENT DENIED | 2D | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2D, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Jul 12, 2022 | B | NOV SENT OUT | 2A | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Jul 12, 2022 | A | VIOLATION DISMISSED | 1E | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | C | VIOLATION DISMISSED | 5A | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | C | VIOLATION DISMISSED | 5A | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | C | VIOLATION DISMISSED | 5A | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | A | VIOLATION DISMISSED | 5A | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | C | VIOLATION DISMISSED | 6K | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DUE TO INOPERABLE HINGES. IN THE ENTRANCE LOCATED AT APT 6K, 6th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | C | VIOLATION DISMISSED | 6K | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 6K, 6th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| Jul 12, 2022 | C | VIOLATION DISMISSED | 6K | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 6K, 6th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''WEST'', 1st FROM SOUTH AT WEST |
| May 12, 2022 | C | VIOLATION DISMISSED | 6K | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ,, IN THE ENTRANCE LOCATED AT APT 6K, 6th STORY, 4th APARTMENT FROM NORTH AT EAST |
| May 6, 2022 | C | NOV SENT OUT | 6G | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. |
| May 6, 2022 | C | NOV SENT OUT | 6G | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. |
| Sep 13, 2019 | A | VIOLATION DISMISSED | Not available | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT ROOF BULKHEAD , 6th STORY |
| Sep 13, 2019 | B | VIOLATION DISMISSED | Not available | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE ROOF BULKHEAD CEILING , 6th STORY |
| Sep 13, 2019 | B | VIOLATION DISMISSED | Not available | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROOF BULKHEAD CEILING AND SOUTH WALL BY FIRE RETARDANT MATERIAL , 6th STORY |
| Sep 10, 2019 | B | VIOLATION DISMISSED | Not available | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOSES, RUGS AND CONSTRUCTION MATERIAL AT PUBLIC HALL STAIRS, 6th STORY |